ENERGY CONSUMPTION PROJECTION IN YOGYAKARTA CITY

https://doi.org/10.22146/ajse.v3i2.17154

Septiana Ria Prihandita(1*), Deendarlianto -(2), Rachmawan Budiarto(3)

(1) Master Program of System Engineering, Faculty of Engineering, Universitas Gadjah Mada
(2) Mechanical and Industrial Engineering Department, Faculty of Engineering, Universitas Gadjah Mada
(3) Engineering Physics Department, Faculty of Engineering, Universitas Gadjah Mada
(*) Corresponding Author

Abstract


Availability of energy is an important aspect for the success of regional development. Yogyakarta city does not have any non-renewable energy sources such as liquid fossil fuels, coal and natural gas. Consequently,
these energy must be supplied from other provinces. The renewable energy potential in Yogyakarta city is not being utilized yet. Final energy consumption continues to rise along with population and economic growth.
Energy planning and development need be done carefully in order to ensure the energy sustainability. This study aim to provide long-term projections in 2012-2025 periods on energy balance, energy demand and
supply based on energy reserves and current condition in order to meet energy elasticity to less than 1. Energy demand projection is calculated based on trend forecasting analysis by LEAP (Long-range Energy Alternatives Planning System).
This result shows that the highest energy user sector in Yogyakarta city period 2012-2025 is transportation sector and the highest of energy demand by type is electricity and gasoline. Renewable energy
potential such as biogas, solar energy, biomass and biodiesel (from using vegetable oil waste) could be developed in Yogyakarta city. Using biodiesel and solar energy could decrease diesel fuel and electricity.
According to the baseline scenario, CO2 emission reached 2,176,182 tons, the first alternative scenario reached 1,925,089 tons and the second alternative scenario reached 1,877,839. Investment cost to build renewable energy in the baseline scenario reached USD 42,045 – USD 546,585. Investment cost to build renewable energy in the first alternative scenario reached USD 10,470,775 – USD 31,002,775. Investment cost to build renewable energy in the second alternative scenario reached USD 31,641,925 - USD 52,173,925.

Keywords


supply-demand energy; LEAP; CO2 emission; Investment cost; Projection

Full Text:

PDF


References

Aritonang, Lerbin., 2009, Business Forecasting, 2nd ed.,

Ghalia Indah, Jakarta.

Central Bureau of Statistics the city of Yogyakarta., 2012,

Kota Yogyakarta dalam Angka 2012, Yogyakarta.

Central Bureau of Statistics the city of Yogyakarta., 2011,

Kota Yogyakarta dalam Angka 2011, Yogyakarta.

Central Bureau of Statistics the city of Yogyakarta., 2010,

Kota Yogyakarta dalam Angka 2010, Yogyakarta.

Central Bureau of Statistics the city of Yogyakarta., 2009,

Kota Yogyakarta dalam Angka 2009, Yogyakarta.

Central Bureau of Statistics the city of Yogyakarta., 2008,

Kota Yogyakarta dalam Angka 2008, Yogyakarta.

Central Bureau of Statistics the city of Yogyakarta., 2007,

Kota Yogyakarta dalam Angka 2007, Yogyakarta.

Darmawan, Arif., 2012, Projected Electricity Demand Using

Household Sector End‐Use Model (A Case Study of

Yogyakarta), thesis, Gadjah Mada University,

Yogyakarta.

Haryono, Eko., 2014, Energy Balance Analysis in Yogyakarta

Province, M. Eng thesis, Gadjah Mada University,

Yogyakarta.

Lanang, Ragil., 2005, Study of Energy Supply and Demand

Planning in Region of Yogyakarta Using LEAP, thesis,

Gadjah Mada University, Yogyakarta.

Ministry of Energy and Mineral Resources., 2010, Indonesia

Energy Outlook 2010, Jakarta.

Ministry of Energy and Mineral Resources and PT. Dharma

Kreasi Nusantara., 2012, Transportation Sector Energy

Consumption Survey, Jakarta.

Ministry of Energy and Mineral Resources., 2012, Study of

Greenhouse Gas Emissions Transport Sector, Jakarta.

National socio‐economic survey., 2012, Expenditure on

Food and Non Food average per capita per month in

Yogyakarta, Yogyakarta.

Suhono., 2010, Demand and Supply Planning Study of

Electrical Energy in Sleman regency Using LEAP, thesis,

Gadjah Mada University, Yogyakarta.



DOI: https://doi.org/10.22146/ajse.v3i2.17154

Article Metrics

Abstract views : 1912 | views : 1478

Refbacks

  • There are currently no refbacks.


Copyright (c) 2016 ASEAN Journal of Systems Engineering




ASEAN Journal of Systems Engineering (AJSE) 
P-ISSN: 2338-2309 || E-ISSN: 2338-2295
Master in Systems Engineering
Faculty of Engineering
Universitas Gadjah Mada
Jl. Teknika Utara No.3, Barek, Yogyakarta, Indonesia 55281 
Website: https://journal.ugm.ac.id/ajse
Email: jurnalajse@gmail.com | ajse@ugm.ac.id