Pembuatan Rangka Atap dan Sarana Pendukungnya Bangunan Pengolah Sampah Desa Banjararum Kalibawang
Bambang Herumanta(1*)
(1) Departemen Teknik Sipil Sekolah Vokasi Universitas Gadjah Mada
(*) Corresponding Author
Abstract
Garbage in Banjararum is increasing due to the source of garbage that always increases. The source of garbage comes from stalls, schools, health centers, and agriculture. To handle the garbage needs a solution to reduce the negative impact on health society. Implementation is carried out with stages, measurements, installation of stakes, excavation of foundation, installation of roof, installation of columns, walls, roof truss, and roof cover. Followed by making a machine room, pools to collect the garbage. The results of this community service are that the garbage processing building consists in the engine room, Pools for garbage collection that will be processed.
Keywords
garbage; health; processing machines, pool collection
Full Text:
PDFReferences
Anonim, (1982), Peraturan Umum Bahan Bangunan Indonesia, Departemen Pekerjaan Umum Republik Indonesia.
Murdock, LJ dan Brook K.M. (Alih bahasa oleh Ir. Stephanus Hindarko), (1999), Bahan dan Praktek Beton, Erlangga, Jakarta.
Mulyono, T, (2004), Teknologi Beton, Andi, Yogyakarta.
Tjokrodimuljo, K, (1996), Teknologi Beton, Nafiri, Yogyakarta.
DOI: https://doi.org/10.22146/jp2m.43477
Article Metrics
Abstract views : 1081 | views : 1027Refbacks
- There are currently no refbacks.
Copyright (c) 2018 Jurnal Pengabdian dan Pengembangan Masyarakat
This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.