Erratum: Coffee Supply Chain Performance Measurement In Ulu Belu District, Tanggamus Regency, Lampung Province

https://doi.org/10.22146/aij.v13i1.121213

Teny Sylvia(1*), Teguh Wiyono(2), Endo Pebri Dani Putra(3), Muhammad Asrol(4), Noveliska Br Sembiring(5), Eka Nur'azmi Yunira(6), Deni Subara(7), Wilda Harlia Devita(8)

(1) Department of Agricultural Industrial Technology, Faculty of Industrial Technology, Sumatera Institute of Technology, Terusan Rya Cudu St., Way Hui, Jati Agung, South of Lampung, Indonesia
(2) Department of Agricultural Industrial Technology, Faculty of Industrial Technology, Sumatera Institute of Technology, Terusan Rya Cudu St., Way Hui, Jati Agung, South of Lampung, Indonesia
(3) Department of Agricultural Industrial Technology, Faculty of Industrial Technology, Sumatera Institute of Technology, Terusan Rya Cudu St., Way Hui, Jati Agung, South of Lampung, Indonesia
(4) Department of Industrial Engineering, Binus University, K. H. Syahdan St., No. 9, Kemanggisan, Palmerah Jakarta, Indonesia
(5) Department of Agricultural Industrial Technology, Faculty of Industrial Technology, Sumatera Institute of Technology, Terusan Rya Cudu St., Way Hui, Jati Agung, South of Lampung, Indonesia
(6) Department of Agricultural Industrial Technology, Faculty of Industrial Technology, Sumatera Institute of Technology, Terusan Rya Cudu St., Way Hui, Jati Agung, South of Lampung, Indonesia
(7) Department of Agricultural Industrial Technology, Faculty of Industrial Technology, Sumatera Institute of Technology, Terusan Rya Cudu St., Way Hui, Jati Agung, South of Lampung, Indonesia
(8) Department of Agricultural Industrial Technology, Faculty of Industrial Technology, Sumatera Institute of Technology, Terusan Rya Cudu St., Way Hui, Jati Agung, South of Lampung, Indonesia
(*) Corresponding Author

Abstract


This Erratum relates to the following article:

Sylvia, T., Wiyono, T., Putra, E.P.D., Asrol, M., Sembiring, N.B., Yunira, E.N., Subara, D., Devita, W.H., 2025. Coffee Supply Chain Performance Measurement in Ulu Belu District, Tanggamus Regency, Lampung Province. Agroindustrial Journal 12(1), 27–42. https://doi.org/10.22146/aij.v12i1.106071

The publisher regrets that, due to a production error, the publication metadata on page 1 of the published PDF version of the article (DOI: 10.22146/aij.v12i1.106071) contained incorrect dates. The incorrect information appeared as: “Received: June-04-2025; Accepted: June-25-2025; Published: June-30-2025”. The correct dates are: “Received: April 17, 2025; Accepted: June 25, 2025; Published: June 30, 2025”.

The editorial office regrets the error.


Keywords


ANP; coffee; performance measurement; SCOR; supply chain

Full Text:

PDF



DOI: https://doi.org/10.22146/aij.v13i1.121213

Article Metrics

Abstract views : 0 | views : 0

Refbacks

  • There are currently no refbacks.


Copyright (c) 2026 Teny Sylvia, Teguh Wiyono, Endo Pebri Dani Putra, Muhammad Asrol, Noveliska Br Sembiring, Eka Nur'azmi Yunira, Deni Subara, Wilda Harlia Devita

Creative Commons License
This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.